News Archive

15th April 2024

Men’s Senior Pennants 2024 – Completed

Men’s Senior Pennants 2024 – Completed

The Men’s Senior Pennants Commenced on Monday 8 April 2024.

Click on link to see all results https://www.golfwa.org.au/senior-men-pennants/

Captains: Orange Division – David MacDonald       Yellow Division – Peter Winkless

Round 1 – Monday 8 April 2024

Orange Division – Played at Kennedy Bay, MCC were defeated by Kennedy Bay 3.5 / 1.5.

Yellow Division –  Played at The Cut, MCC won against The Cut 2 / 3.

Round 2 – Tuesday 16 April 2024

Orange Division – Played at MCC, MCC won 4.5 / 0.5 against Kennedy Bay.

Yellow Division – Played at MCC, MCC were defeated by The Cut 2 / 3

Round 3 – Tuesday 23 April 2024

Orange Division – Played at MCC, MCC won 4 /1 against Kwinana GC

Yellow Division –  Played at MCC, MCC won 4 / 1 against Kwinana GC

Round 4 – Monday 29 April 2024

Orange Division – Played at Pinjarra, MCC were defeated 3 / 2 against Pinjarra.

Yellow Division – Played at Secret Harbour, MCC won 3 / 2 against Secret Harbour.

Round 5 – Tuesday 7 May 2024

Orange Division – Played at MCC, MCC won 4.5 / 0 against Pinjarra.

Yellow Division – Played at MCC, MCC won 5 / 0 against Secret Harbour.

Round 6 – Monday 13 May 2024

Orange Division – Played at Kwinana, MCC were defeated 4.5 / 0.5 against Kwinana.

Yellow Division – Played at Kwinana, MCC were defeated 4 / 1 against Kwinana.

Read More

15th April 2024

Course Update – April 2024

Course Update – April 2024

As summer has finally made way for autumn, both day and night time temperatures have dropped quite quickly. Medium temperatures have dropped from 30’s to mid 20’s. Also, last month we finally got some rain, with 6mm falling on Friday the 8th of March. This was the first rainfall recorded at the club since August 16th  2023, when we got a massive 1.6mm.
 
GREENS
With the weather changing, we have been able to provide better putting surfaces, with green speeds increasing each day. The greens are generally very healthy, considering the summer we had, and the transition period we are currently going through. As I am sure everyone has seen, we had issues with the fourth green, which has now been repaired, and should be back to full playability within weeks.
 
The issues we had were multi faceted. New greens are a great deal more high maintenance. A long period of extreme heat and irrigation issues were at the core of the problems. We have resolved the main issues to hopefully safeguard from this happening again.
 
TEES
All of the tees are in very good shape, as they should be at this time of the year. Maintenance has been increased on all of the tees over the growing season with added wetting agents, fertiliser, topdressing, divoting and daily marker movement. This year the plan is to oversew the 6th, 14th and 17th tees. These are generally the worst performing tees on the course during winter due to being par threes, their size, and the amount of trees around and above them. The rye grass we are planting won’t necessarily provide full coverage, but will make them look a lot better.
 
FAIRWAYS
Considering the summer we have had, and the irrigation issues we suffered during this time, the fairways are in very good condition. We will again ask all players to assist by chopping in divots with a club or shoe to allow the best chance of providing the ideal playing surface.
 
BUNKERS
We have been trying to spend more time on maintenance in this area as they are sometimes way down our priority list. Most people are probably not aware, that to maintain bunkers in a very good condition takes more man hours than greens, tees and fairways combined weekly. When we have low staff numbers or other issues that take priority, bunkers sometimes have to take a backseat.
 
IRRIGATION/WATER SUPPLY
We have had a very long six months with our irrigation system with numerous issues arising at different times. Currently the system is only running at about 65%, but that is much better than we have been. Some of the issues we have had are as follows:

  • Electric motor on one pump failed
  • Variable speed drive controlling  the entire pump station failed
  • Two check valves on the pump station failed, rendering both of these pumps unusable
  • The self cleaning filter failed reducing flow for a very extended period of time
  • The wet end, (suction part of the pump) failed, making it run at 50% capacity
  • The waste water treatment plant had issues so it was unable to provide water for about ten days
  • About a dozen wiring issues across the course, shutting the system down for a period each time.
  • Several valve and sprinkler failures and leaks

Half of these issues during a normal season would be manageable, but all of these problems during one of the hottest and driest seasons on record has been difficult. These issues have required us to spend a great deal more hours repairing and manually irrigating than we would have preferred. Our system should be back up to capacity over the next 4-6 weeks. Unfortunately getting parts for anything is taking a very long time at the moment.
 
GENERAL WORKS
Now that the weather and irrigation are more on our side, we have started our herbicide program across the course. The removal of the couch from the greens and kikuya from the rest of the course is a long term process, not just during the season, but year in year out. Invasive grasses unfortunately are never fully controlled, but when under control, as it is at the moment, it is easier to remove for the season. The kikuya needs to be sprayed twice two weeks apart to be fully eradicated, which is quite a process.
 
 The couch removal from the greens this year is the first time we will be using a newly registered product designed specifically for this task. Being a new product, we have trialled it with mixed results since late last year, but we believe we have it where it will work at its best efficacy. There are many parameters we need for this product to work safely, and now with the temperature where it needs to be, we have started. Like most other herbicides, this is a multi application product. This is to ensure a good kill on the target grass with little to no damage to the bentgrass. People we have spoken to about this product have had mixed results ranging from excellent to not working at all. Our last trial yielded at least 75% reduction in the couch, which will be a very good result, especially if used year on year with limited damage to the putting surface.
 
We have now completed the extensions to the 2nd and 15th blue/black marker tees with turf being laid during the week prior to Easter. Both of these works have been selected from the course master plan for this year, as they will help provide a more challenging course for our members and for the up coming W.A. Open. They were also the least disruptive and time manageable works so, we could continue to concentrate on preparations for the upcoming golf season for the members and open events alike.
 
John Benbow
Director of Facilities

Read More

12th April 2024

The Bledisloe Golf Challenge – Aussies v Kiwis – Thursday 25th April 2024

The Bledisloe Golf Challenge – Aussies v Kiwis – Thursday 25th April 2024

The Bledisloe Golf Challenge is filling up fast.  If you would like to join in the fun, please return your entry form and payment to the office as soon as possible.

Read More

11th April 2024

Srixon / Cleveland Custom Fitting Day – Thursday 2 May 2024

Srixon / Cleveland Custom Fitting Day – Thursday 2 May 2024

The Srixon/Cleveland Custom Fitting Day will be held on Thursday 2 May 2024, Srixon Fitter Kane Streat, WA representive Carl Evans and MCC’s Braden Becker will be operating Trackman on the day with a full range of hardware.

Bookings sheet below, or call the golf shop on 9581 2968.

Read More

4th April 2024

Kyros Homes Super Six – Starting Saturday 6th April 2024

Kyros Homes Super Six – Starting Saturday 6th April 2024

Dear Members,

We are excited to announce we have secured sponsorship with Kyros Homes (Walter Tenhaff) to run a Secret Six competition in conjunction with a Wednesday and Saturday Individual Stableford competition.

This will start this Saturday April 6th, until closing day, Saturday November 23rd.

 The format will be the following.

  • No additional comp fee charged
  • $40 to the sole winner (no count backs or draws)
  • With no sole winner it will jackpot to the next competition ($40, $80, $120 etc)
  • When a sole winner is determined it will start back to $40 for the next competition

The selection of these holes is based on x1 par 3, x1 par 5 and x4 par 4’s with three holes on each nine.

Prize money will be applied to members Prize Account.

Graham Bowen, MGD Captain

Read More